How to Shutdown/Restart Fronius GEN24

  • 00:02
    Here we are at a GEN24 and BYD stack.
  • 00:06
    And I'm going to run you through the shutdown and restart procedure.
  • 00:10
    You might need to do this if we notify you or in case of a prolonged power outage, your batteries may turn off.
  • 00:18
    In which case a full shutdown and restart is what we need to get it going again.
  • 00:23
    There'll always be a shutdown procedure next to your inverter or battery if we've installed it. So we can just work through that and work back through it to turn it back on.
  • 00:36
    But I'll walk you through it now.
  • 00:38
    First things first. Is to turn off the main switch inverter supply.
  • 00:42
    There may be a inverter AC isolator. If your inverter is too far from the main switchboard.
  • 00:50
    The next step is the PV ARRAY DC isolator which is this switch on the front.
  • 00:54
    It goes to the zero and as you can see, it can be a little bit sticky.
  • 00:59
    It's spring loaded to make it effective when it turns off. After we've done that, we move to the battery stack.
  • 01:07
    On the right hand side of the battery is the battery DC isolator.
  • 01:12
    Just open this cover, there's a little latch you may have to push down on it to open.
  • 01:18
    From there you can see this one big breaker. Up is on. Down is off. And you can also see a red indicator.
  • 01:27
    Red means that it's on and red is for danger. Green means it's off and means safe. So we'll go ahead and turn this off.
  • 01:38
    Then we move over to the push button. We press that and hold it for 5 seconds until the lights go out.
  • 01:54
    Wait then until your inverter lights all turn off, then we know that it's lost power, and we're good to restart.
  • 02:05
    First thing first is to turn the battery back on. Just over to the battery DC isolator and we flick this breaker up.
  • 02:14
    We don't need to worry about the push button on the restart.
  • 02:18
    Next we go to PV ARRAY DC Isolator and turn that back on.
  • 02:23
    Wait a couple of seconds and then we turn on the main switch.
  • 02:29
    Now you'll see a lot of lights.
  • 02:32
    It takes about 2 minutes for it to fully restart, but you'll be able to see it back on your monitoring at this point and you'll see a green light and a blue light if everything's gone to plan and you're back on line.

In this video, the KDEC team will demonstrate how to correctly shut down and restart your Fronius GEN24 Solar Inverter. You may need to perform this procedure during certain situations, such as a prolonged power outage wherein your batteries may turn off.

Following the correct sequences when powering off or restarting the Fronius GEN24 is essential since solar inverters are designed to handle high voltages from solar panels and batteries, and improper handling can lead to damage, safety hazards, or operational issues. To learn how to properly shut down and restart the Fronius GEN24 to ensure its system’s safety, longevity, and efficiency, watch this quick and easy-to-follow instructional video. Through this guide, you’ll be able to maximise your solar inverter’s performance and protect its integrity.

If you want to learn more about the Fronius GEN24 or if you have any questions about this solar inverter, you may get in touch with a specialist from KDEC by calling us at 02 6021 6033 or sending us an email at kdec@kdec.com.au.

Related Videos:

Committed to delivering clean energy solutions

As Albury Wodonga's leading solar experts, Kdec’s promise of quality service is guaranteed with our roster of trained and licensed Electricians. Whether you’re a commercial business, a new homeowner or looking to upgrade your family home, our 25 years of experience means you’re in safe hands.

Talk to a KDEC team member

Our Office

30 Ruby Court, Albury 2640

Contact Us

  • 02 6021 6033
  • kdec@kdec.com.au
facebook instagram

Quick Links

  • About KDEC
  • KDEC Team
  • Clients & Suppliers
  • Blog
  • KTECH
  • Contact Us
  • FAQ

Our Solutions

  • Solar Solutions
  • Solar Consultancy
  • Electrical Solutions
  • Fibre and Data Solutions
  • EV Chargers

Our Works

  • Industrial
  • Commercial
  • Domestic
  • Fibre and Data
  • Case Studies

Licence Number: NSW 363462C | Vic 29085
© Copyright 2021 by KDEC Electrical. All rights reserved.
Website by Digital Marketer Bee.

4.9
Based on 109 reviews
powered by Google
js_loader